Five stars in continuous hard work for a week
Published:
2022-11-10 11:08
Since the beginning of summer this year, the continuous high temperature weather has brought great challenges to outdoor operations. In the face of the high temperature, the employees of the Engineering Department took the initiative to stick to their posts, worked hard for a week, and completed the repair of the exterior wall anti-corrosion wood with due diligence, laying a solid foundation for the upcoming five-star review.
The anti-corrosion wood on the fourth floor exterior wall of Building 5 of the hotel was installed seven years ago when it was rebuilt. As time went on, the anti-corrosion wood exposed outdoors gradually began to rot due to the sun and rain, which not only made the appearance ugly, but also brought potential safety hazards to the glass shed covering the anti-corrosion wood. In order to eliminate potential safety hazards, the Engineering Department, on the premise of ensuring the daily maintenance of facilities and equipment, organized employees to analyze and demonstrate, and finally decided to saw off the wooden beams protruding out of the glass shed and use aluminum plastic plates for decorative edge sealing and beautification.
Shangyu is in the dog days. The weather is extremely hot. The outdoor temperature at noon is more than 40 degrees. The reflection of the glass is blinding, which brings great difficulties to maintenance workers Lou Hua and Wang Ping. Two employees of the Engineering Department braved the high temperature and the hot summer, and their work clothes were soaked with sweat. None of them said "go ahead" lightly, especially Lou Hua, who was struggling on the glass roof. In the face of the high temperature at the scene, he was not impatient and showed his carpentry maintenance level. He worked hard for a week under the high temperature, and completed the maintenance task on time, with quality and quantity guaranteed.
Related news
——